Non-Compliance detail


  
Summary
 
Licence number: 4848
Annual Return Start: 17 Aug 2003
Annual Return End: 16 Aug 2004
Date Received: 18 Oct 2004
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2 Building 205B baghouse not samples as new addition to licence, and monitoring equipment unable to be installed. Appropriate Action taken by licensee 1
M2 Point 4 not sampled as plant broken down during sampling program. EPA has written to licensee regarding non-compliance and relevant action 1
M2 Monitoring at point 67 not done due to lack of fuel (briquettes), so boiler unable to be operated. Appropriate Action taken by licensee 1
L3.1 Suspended solids limit exceeded on 3 occassions in river discharge. EPA to monitor future compliance with this condition 3
L3.1 Minor exceedance of nitrogen limit in river discharge. Appropriate Action taken by licensee 3
L3.1 Oil and Grease limt exceeded by 1 mg/l in river discharge. Appropriate Action taken by licensee 1
L3.1 Lead limit exceeded by 0.01 mg/l in river discharge. Appropriate Action taken by licensee 1